Micro-hydro power: head, flow, turbines and licences
How to work out the power from a stream, measuring head and flow, choosing a turbine, intakes and penstock pipe, batteries and dump loads, the licences needed in the UK, US and Australia, and maintenance.
By Michael Johnson · Updated 17 November 2026 · How we check our guides
If you have a stream with a decent drop, micro-hydro can be the best off-grid power source there is: it runs day and night, often produces most in winter when solar is weakest, and a small turbine can supply more energy than a large solar array. This guide explains how to measure head and flow, work out the power, choose a turbine, connect it to batteries, and the licences you need in the UK, US and Australia.
1. How much power? The formula
| Flow | Net head | Power at 55% efficiency | Energy per day |
|---|---|---|---|
| 2 L/s | 20 m | About 215 W | About 5.2 kWh |
| 5 L/s | 10 m | About 270 W | About 6.5 kWh |
| 10 L/s | 30 m | About 1.6 kW | About 39 kWh |
| 50 L/s | 3 m | About 810 W | About 19 kWh |
High head and low flow is usually cheaper than low head and high flow: you need less water through a smaller turbine.
2. Measuring head
- Gross head is the vertical drop from intake to turbine. Net head is gross head minus friction losses in the pipe (aim for less than 10–15%).
- Measure with a laser level or a sight level and staff, in stages down the slope, or with a long hose filled with water and a pressure gauge (10 m head = about 1 bar = 14.2 psi).
- GPS and phone altimeters aren't accurate enough for low-head sites.
3. Measuring flow
- Bucket method for small streams: divert all the water into a bucket of known size and time it. 10 L in 4 seconds = 2.5 L/s.
- Float method for bigger streams: measure the cross-section area and time a float over a set distance; multiply area × speed × about 0.8.
- Weir: a notched board across the stream gives accurate readings over time.
- Measure through the year, especially in the driest months. You can't take all the water: the licence usually requires a minimum "hands-off" flow left in the stream.
4. Choosing a turbine
| Type | Head | Flow | Notes |
|---|---|---|---|
| Pelton / Turgo | High (10–200 m+) | Low | Common for off-grid; small, robust; one or more nozzles |
| Crossflow | Medium (3–50 m) | Medium | Handles varying flow well |
| Propeller / Kaplan | Low (2–10 m) | High | Larger civil works |
| Archimedes screw | Low (1–10 m) | High | Fish-friendly; larger community schemes |
| Pump as turbine | Medium to high | Fixed | Low cost, but works best at one flow |
5. Intake and penstock pipe
- The intake needs a self-cleaning screen (a Coanda screen is popular) to keep out leaves, stones and fish.
- Penstock pipe is usually HDPE or PVC, sized so friction losses stay low; bigger pipe costs more but delivers more head. Bury it to protect it from frost and UV.
- Fit a valve at the turbine, closing it slowly to avoid water hammer.
- Protect against flood damage: intakes and turbine houses take the full force of storms.
6. Electrics: batteries, dump loads and AC
- Battery-based (most off-grid micro-hydro): the turbine charges a 12, 24 or 48 V battery bank continuously; an inverter supplies AC.
- A hydro turbine must always have a load. If the battery is full and the load is disconnected, it overspeeds and the voltage rises. Use a diversion (dump) load controller that sends surplus power to a water or space heater. Don't use an ordinary solar PWM controller that simply disconnects.
- Long cable runs from turbine to house are common: use higher-voltage turbines (or AC transmission) and size cable with the AC voltage drop or DC voltage drop calculator.
- Larger systems may generate AC directly, with an electronic load controller.
- Surplus heat is free hot water: see the off-grid hot water guide.
7. Licences and permissions: UK, US and Australia
| Place | What you usually need |
|---|---|
| England | Environment Agency: abstraction licence (water diverted through the turbine) and impoundment licence (weir or dam), plus possibly a flood risk activity permit and fish pass; planning permission from the council. |
| Wales | Natural Resources Wales: abstraction and impoundment licences, plus planning. |
| Scotland | SEPA: authorisation under the water environment regulations (CAR, replaced by the Environmental Authorisations regime), plus planning. |
| Northern Ireland | NIEA abstraction and impoundment licences, plus planning. |
| USA | Depends on the stream: FERC may have jurisdiction over hydropower on navigable waters or that affects interstate commerce (with an exemption process for small systems); state water rights and permits; US Army Corps of Engineers permits for work in streams. |
| Australia | A state water licence or work approval (taking water and building in a watercourse), plus council approval. |
Talk to the regulator early. In England, the Environment Agency offers pre-application advice for hydropower schemes. Fish passage and keeping enough water in the stream are the usual sticking points.
8. Maintenance and problems
- Clean the intake screen, especially in autumn and after storms.
- Check nozzles for blockages and the turbine bearings for noise.
- Watch for frozen pipes in severe cold.
- Falling output usually means a blocked intake or nozzle, low flow, or air in the penstock.
- Check the dump load works: test it by disconnecting the house load.
9. Frequently asked questions
How much power can a small stream produce?
Power (W) ≈ 9.81 × flow (L/s) × head (m) × 0.5–0.7. A stream with 2 L/s and 20 m of head gives about 200 W, or about 5 kWh a day.
Do I need a licence for micro-hydro in the UK?
Almost always. In England you need Environment Agency abstraction and impoundment licences, and usually planning permission; Wales, Scotland and Northern Ireland have their own regulators.
Is micro-hydro better than solar?
Where there's a good site, yes: it runs 24 hours a day and produces most in winter. But few sites are suitable, and installation and permissions cost more.
Why does a hydro turbine need a dump load?
Disconnecting a running turbine makes it overspeed and the voltage soar. A diversion controller sends surplus power to a heater instead.
10. Sources
- GOV.UK, harnessing hydroelectric power: gov.uk
- GOV.UK, apply to build a new hydropower scheme: gov.uk
- Natural Resources Wales, approvals, licences and consents for hydropower: naturalresourceswales.gov.uk
- Energy Saving Trust, hydroelectricity: energysavingtrust.org.uk
New to some of the terms? See the glossary. Not sure where to start? Try start here.