Off-grid solar system design: 3 kW and 5 kW systems for the UK, USA and Australia

Two complete stand-alone solar systems on a 48 V lithium battery bank, from a 3 kW starter system to 5 kW and beyond. Includes the protection and cable schedule, month-by-month PVGIS simulations for six locations, generator planning, earthing, surge protection and the rules in each country: BS 7671, NEC Articles 690, 706 and 710, and AS/NZS 4509, 5033, 5139 and 3000.

By Michael Johnson · Updated 18 November 2026 · How we check our guides · Open the wiring diagram full size

Safety and legal note. A 48 V lithium bank can deliver many thousands of amps into a fault. PV strings produce up to about 230 V DC whenever there is daylight, and that voltage cannot be switched off at the panels. The 230 V or 120/240 V AC side is an electrical installation in law:
  • In Australia, it must be done by a licensed electrician.
  • In the UK, it must be certified (EIC) and usually notified under Building Regulations.
  • In the USA, it normally needs a permit and an inspection.
This document is a worked design for the equipment stated. Check everything against the manuals for the parts you actually buy, against your local rules, and with the person who will certify the work.

1. Is there a legal size limit?

No country sets a maximum size for a system that is truly off-grid. The power limits people quote apply only to systems connected to the public grid:

CountryLimit you may have heard ofDoes it apply off-grid?What does change as an off-grid system grows
UKENA EREC G98 (micro-generation up to 16 A per phase, about 3.68 kW, connect and notify) and G99 (larger systems, DNO approval first).No. G98 only covers generators "designed to normally operate in parallel with" the public low-voltage network. It expressly excludes islanded installations (scope, clause 2.10). A property with no grid connection at all falls under neither G98 nor G99. The exception: if the property also has a grid supply and the system can switch between grid and island (a backup or changeover arrangement), that islanded operation falls under G99. Speak to the DNO before connecting anything to a grid-fed installation.Battery location rules (PAS 63100). Building Regulations notification. Inverter paralleling or three-phase above about 10 kW.
AustraliaNetwork export limits, often 5 kW per phase (set by each distributor under AS/NZS 4777).No. They apply only to grid-connected inverters.Battery arc-flash energy (AS/NZS 5139, as applied in the SEIAPI guideline): above 4 cal/cm², not in a building with habitable rooms; above 8 cal/cm², split into segments; domestic below 40 cal/cm².
USAUtility interconnection limits and NEC 705 "120% rule".No. A stand-alone system falls under NEC Article 710, not 705.Residential battery limits (NFPA 855 and IRC R328): 20 kWh per ESS unit. 40 kWh in total in a utility or storage room, and 80 kWh in total in a garage, on an outside wall or in a detached structure.

So this document follows your brief: a 3 kW system scaled up to 5 kW. scaling beyond 5 kW shows how to go further and which rules start to bite.

2. The two reference systems

Part3 kW system5 kW systemNotes
Inverter/charger48 V, 3 kVA class (e.g. Victron MultiPlus-II 48/3000/35)48 V, 5 kVA class (e.g. MultiPlus-II 48/5000/70)VA is not continuous watts. The 48/3000 gives about 2.4 kW continuous at 25 °C and the 48/5000 about 4 kW. If you need a full 3 kW or 5 kW all day, pick the next size up. USA: the 3 kW system uses the 120 V model. The 120 V 48/5000 has a 120 V output only, so the US 5 kW system uses two 120 V 48/3000 units stacked for 120/240 V split phase (6 kVA, about 4.8 kW continuous), or one native split-phase inverter.
Battery2 × 5 kWh 48 V (51.2 V) LiFePO4 = 10 kWh3 × 5 kWh = 15 kWhRack or wall modules with a BMS that talks to the inverter. USA: each ESS unit ≤ 20 kWh, listed to UL 9540.
Solar array8 × 450 W = 3.6 kWp (2 strings of 4)16 × 450 W = 7.2 kWp (2 arrays, each 2 strings of 4)Off-grid arrays are oversized compared with the inverter so they still charge the battery in poor weather.
Charge controller1 × MPPT 250/702 × MPPT 250/70Each controller is 70 A, about 4 kW nominal at 48 V. 250 V absolute maximum PV voltage (245 V operating). Maximum PV short-circuit current 70 A.
Generator (optional)about 3–5 kVAabout 6–8 kVAConnects to the inverter's AC input for winter top-up.
AC outputInverting at its continuous rating: UK/AU 2.4 kW at 230 V ≈ 10.4 A; USA 2.4 kW at 120 V ≈ 20 A. Generator pass-through: up to the transfer switch rating (32 A UK/AU, 50 A USA).Inverting at its continuous rating: UK/AU 4 kW at 230 V ≈ 17.4 A; USA 2 × 2.4 kW split phase ≈ 20 A per leg. Generator pass-through: up to 50 A.Feeds a normal consumer unit, switchboard or panel. When the generator runs, its power passes through the inverter, up to the transfer switch rating, so the output breaker and cable are sized for that (the protection schedule).

The example module is a typical 450 W panel: Voc 49.5 V, Isc 11.6 A, Vmp 41.5 V, Imp 10.85 A, Voc temperature coefficient −0.27 %/°C, maximum series fuse 20 A. Redo every calculation with your own module's datasheet.

3. Wiring diagram

Off-grid solar – reference single-line diagram 48 V LiFePO4 · values shown as 3 kW system / 5 kW system · 230 V AC version (UK and Australia) PV array 1 2 strings × 4 × 450 W = 3.6 kWp Voc ≈ 198 V (≈ 217–233 V cold) PV DC isolator 2-pole, DC-PV rated, ≥ 250 V MPPT 1 250/70 70 A charge, 245 V max F2 100 A MPPT output PV array 2 (5 kW system only) 2 strings × 4 × 450 W = 3.6 kWp Voc ≈ 198 V (≈ 217–233 V cold) PV DC isolator 2-pole, DC-PV rated, ≥ 250 V MPPT 2 250/70 70 A charge, 245 V max F3 100 A MPPT output C1 6 mm² PV cable 48 V POSITIVE BUSBAR (fused distribution, e.g. Lynx) Battery isolator DC rated, ≥ F7 rating F7 160 A / 250 A main battery fuse, Class T C4 50 / 95 mm² F4 125 A Battery 1 51.2 V 5 kWh LiFePO4 + BMS F5 125 A Battery 2 51.2 V 5 kWh LiFePO4 + BMS F6 125 A Battery 3 51.2 V 5 kWh 5 kW only Battery: 3 kW system 2 × 5 kWh = 10 kWh · 5 kW system 3 × 5 kWh = 15 kWh Each battery has its own fuse or breaker on its positive; breaking capacity (kA) ≥ combined fault current of the paralleled batteries. Shunt battery monitor 48 V NEGATIVE BUSBAR (all negatives, load side of shunt) F1 125 A / 200 A busbar fuse, backed by F7 C2 35 mm² / 70 mm² (≤ 5 m) Inverter/charger 48 V 3 kVA / 5 kVA (e.g. MultiPlus-II 48/3000 or 48/5000) internal N–E relay 230 V AC SIDE Generator (optional) into inverter AC-in Generator: bonded neutral (inverter N–E relay opens on AC input); RCD Type B unless maker allows Type A C3 4 / 10 mm² AC output breaker 32 A / 50 A, + 2-pole lockable isolator Main switchboard / consumer unit Main switch – double pole RCBO 30 mA Type A – lights B6 RCBO 30 mA Type A – sockets B16 RCBO 30 mA Type A – other Neutral bar · Earth bar AU: MEN link here (only one N–E link) MET → earth electrode inverter case & PE Labels & notices dual-supply / PV / battery warnings, shutdown procedure, earthing system Key DC positive DC negative AC line AC neutral Protective earth / bonding Optional / 5 kW only F = fuse/breaker, C = cable. Figures before “/” are the 3 kW system, after it the 5 kW system. USA: same DC side; AC is 120 V or 120/240 V split phase – see USA section and diagram.
Single-line diagram. Values before "/" are the 3 kW system, after it the 5 kW system. Dashed items are optional or only in the 5 kW system. The US AC side is shown in the US section.

4. Design calculations

PV string voltage (cold weather)

PV open-circuit voltage rises as the panels get colder. Four panels in series give 4 × 49.5 = 198 V at 25 °C. Correct this for the coldest morning at the site:

Site minimumMethodString VocUnder 245 V?
UK, −10 °C198 × (1 + 0.0027 × 35)216.7 VYes
Australia, −10 °C (inland/alpine)AS/NZS 5033 coefficient method, or the generic factor table in the SEIAPI guideline216.7 V by coefficient. About 226 V by the generic table.Yes
USA, −40 °C (coldest states)NEC 690.7(A)(1), module coefficient, ASHRAE extreme minimum232.8 VYes, just, using the module coefficient method. The alternative NEC 690.7(A) table factor (1.25 at −40 °C) gives 247.5 V, which fails. At colder sites, or with higher-Voc modules, use 3 in series.

PV current, cables and string fuses

Battery current

3 kW system5 kW system
Inverter DC draw used for cable and fuse sizing. Assumes 3 kW / 5 kW of AC output (a margin above the 2.4 kW / 4 kW continuous real-power rating at 25 °C), a low battery voltage of 44 V and 94% efficiency: DC amps = W ÷ (44 × 0.94). At the 2.4 kW / 4 kW continuous rating it's about 58 A / 97 A. The 3,000 VA / 5,000 VA figures are the continuous apparent-power ratings; peak (surge) ratings are listed separately on the datasheet≈ 73 A≈ 121 A
Maximum charge current (MPPTs + inverter charger)70 + 35 = 105 A140 + 70 = 210 A. Limit it to what the battery accepts with the inverter's charge-current setting (DVCC).
Inverter fuse F1 and cable C2 (Victron table, cable runs up to 5 m)125 A, 35 mm²200 A, 70 mm²
Main battery fuse F7 and cable C4 (junction → isolator → busbar)160 A Class T, 50 mm²250 A Class T, 95 mm²
Per-battery fuses F4–F6125 A each, 35 mm² leads125 A each, 35 mm² leads
Battery-cable voltage drop (2 m run)≈ 0.14 V (0.3%)≈ 0.12 V (0.3%)

Why there's a main fuse as well as a fuse on each battery: fuses in parallel add up. Three 125 A battery fuses could let 375 A into the shared cable without any of them blowing. F7 protects the shared cable and the isolator. The breaking capacity of every DC fuse must also exceed the combined short-circuit current of the paralleled batteries. AS/NZS 5139 Amendment 1 (December 2025) now says this explicitly. Ask the battery maker for the short-circuit figure. The per-battery devices F4–F6 and the main fuse F7 must each have the full breaking capacity themselves: use Class T fuses (20 kA), NH DC fuses, or the battery's own rated DC breaker. The busbar fuses F1–F3 (MEGA fuses in a Lynx Distributor, for example) have a lower breaking capacity. They rely on the upstream Class T fuse F7 as backup protection, so confirm that combination with the maker. Otherwise use Class T or NH holders for F1–F3 too.

5. Protection and cable schedule

Metric sizes are for 90 °C single-core copper run singly (not bundled), which is how Victron specifies its battery cables. US sizes are copper rated at 75 °C (NEC Table 310.16) unless stated, and never smaller than the metric size. The exception is PV wire, which is sized to NEC 690.8 (10 AWG is ample for 18.1 A).

RefCircuit3 kW device / cable5 kW device / cableUS cable (3 kW / 5 kW)
C1PV strings → isolator → MPPTNo fuse with 2 strings. 6 mm² H1Z2Z2-K (EN 50618)Same, per array10 AWG PV wire (UL 4703)
F2, F3MPPT → busbar100 A, 25 mm²100 A each, 25 mm²2 AWG (115 A)
F1 / C2Busbar → inverter125 A, 35 mm²200 A, 70 mm²1 AWG (130 A) / split phase: 2 × (125 A, 1 AWG), one per inverter
F7 / C4Battery junction → isolator → busbar160 A Class T, 50 mm²250 A Class T, 95 mm²2/0 AWG (175 A) / 250 kcmil (255 A)
F4–F6Each battery positive125 A, 35 mm²125 A, 35 mm²1 AWG (130 A)
S1Battery isolatorDC rated, ≥ 160 A, 60 V DC or moreDC rated, ≥ 250 AListed DC disconnect
–Negative busbar ↔ shunt ↔ batteriesSame sizes as the matching positive cablesSameSame
C3Inverter AC output → output breaker + isolator → boardOutput breaker 32 A (= the 48/3000's 32 A transfer switch rating), 4 mm². Set the AC-input current limit to suit the generator.Output breaker 50 A (= the 50 A transfer switch rating), 10 mm²3 kW: 50 A breaker, 6 AWG (transfer switch 50 A on 120 V models). 5 kW split phase: 2-pole 50 A, 6 AWG.
–Generator → inverter AC-inPer the generator rating and the inverter's input current limitSameSame

The sizes are checked against BS 7671 Appendix 4 / AS/NZS 3008.1.1 ratings for single-core cables in free air, and against NEC 310.16. Your installation method (enclosed in trunking, bundled, hot loft) can lower a cable's rating considerably, so recheck with the method you actually use. In Australia, AS/NZS 3008.1.1:2025 is the current cable-selection edition.

6. Real sun data: what the systems deliver, month by month

The reference systems were simulated with PVGIS 5.3, the European Commission's free solar tool, for six locations. It used 19 years of hourly satellite and weather data, including local horizon shading.

Example daily load

Load3 kW system (6 kWh/day)5 kW system (10 kWh/day)
Fridge-freezer (A-rated)0.6 kWh0.6 kWh
Lighting (LED)0.4 kWh0.6 kWh
TV, router, laptops, phones1.0 kWh1.5 kWh
Washing machine (cold or eco wash, solar hours)0.5 kWh1.0 kWh
Cooking: induction hob, microwave, kettle2.0 kWh3.5 kWh
Water pump, central heating pump or fans0.5 kWh1.0 kWh
Power tools, vacuum, other0.5 kWh1.0 kWh
Inverter standby and losses0.5 kWh0.8 kWh
Totalabout 6 kWh/dayabout 10 kWh/day

Space heating and hot water by electricity are left out. They would need several times more energy in a UK winter. Use wood, LPG, a heat pump on a much larger system, or the summer surplus (see using surplus energy).

PV yield per kWp, by month

Average kWh per day from 1 kWp, tilted at about the latitude (steeper in the UK) and facing the equator, with 14% losses:

Location (tilt)JanFebMarAprMayJunJulAugSepOctNovDecYear
London (50°)1.52.02.83.73.63.83.73.43.22.41.81.31014
Glasgow (55°)0.91.62.43.33.43.33.32.92.51.81.30.8841
Seattle WA (45°)1.72.53.33.84.03.84.44.43.92.91.91.51160
Phoenix AZ (35°)4.65.25.65.75.45.14.64.75.05.24.84.31829
Sydney (35°)4.54.44.24.13.93.33.84.44.94.84.64.61559
Melbourne (40°)4.84.84.33.62.82.52.83.34.14.54.54.71426

Whole-system simulation

Each cell shows the average energy delivered per day (kWh) and, beneath it, the percentage of days the battery hit its 10% reserve, which means load shedding or a generator start.

3 kW system: 3.6 kWp, 10 kWh battery, 6 kWh/day load

LocationJanFebMarAprMayJunJulAugSepOctNovDecYear
London3.77
74%
4.74
55%
5.58
24%
5.94
5%
5.92
5%
5.98
2%
6.00
0%
5.95
2%
5.90
5%
5.44
25%
4.67
56%
3.80
76%
27%
Glasgow2.51
94%
4.06
69%
5.27
39%
5.89
10%
5.96
3%
5.97
1%
6.00
1%
5.93
3%
5.67
17%
4.73
50%
3.69
78%
2.36
95%
38%
Seattle WA4.13
58%
5.15
33%
5.76
10%
5.99
3%
5.98
1%
6.01
1%
6.00
0%
6.00
0%
5.94
1%
5.62
17%
4.62
47%
3.82
67%
20%
Phoenix AZ6.00
0%
6.00
1%
6.00
0%
6.00
0%
6.00
0%
6.00
0%
6.00
0%
6.00
0%
6.00
0%
6.00
0%
5.99
0%
6.00
1%
0%
Sydney5.96
1%
5.98
0%
5.95
2%
5.97
1%
5.96
2%
5.88
5%
5.97
2%
6.03
0%
6.01
1%
6.00
1%
5.97
0%
6.03
0%
1%
Melbourne6.00
0%
5.97
0%
6.00
0%
5.93
1%
5.92
4%
5.87
8%
5.92
6%
6.04
1%
6.02
0%
6.01
0%
6.01
0%
5.99
0%
2%

5 kW system: 7.2 kWp, 15 kWh battery, 10 kWh/day load

LocationJanFebMarAprMayJunJulAugSepOctNovDecYear
London6.85
68%
8.34
48%
9.49
20%
9.93
4%
9.91
3%
9.99
1%
10.00
0%
9.93
2%
9.91
3%
9.31
21%
8.24
46%
6.96
68%
24%
Glasgow4.89
90%
7.30
64%
9.15
30%
9.90
6%
9.96
2%
9.99
0%
10.00
0%
9.92
2%
9.66
11%
8.29
43%
6.82
70%
4.65
90%
34%
Seattle WA7.38
52%
8.84
30%
9.68
9%
9.97
3%
9.98
0%
10.02
0%
10.00
0%
10.00
0%
9.90
2%
9.54
14%
8.10
39%
6.96
61%
18%
Phoenix AZ9.99
1%
10.00
0%
10.00
0%
10.00
0%
10.00
0%
10.00
0%
10.00
0%
10.00
0%
10.00
0%
10.00
0%
9.99
0%
10.00
1%
0%
Sydney9.96
0%
9.98
0%
9.94
2%
9.96
1%
9.94
2%
9.82
4%
9.96
2%
10.04
0%
10.01
1%
10.01
0%
9.96
0%
10.03
0%
1%
Melbourne10.01
0%
9.94
0%
10.00
0%
9.89
1%
9.91
2%
9.86
6%
9.91
6%
10.07
1%
10.04
0%
10.00
0%
10.02
0%
9.98
0%
1%
What the numbers say:
  • Sydney, Melbourne, Arizona: both systems cover their loads on 98% or more of days through the year. A generator is an occasional backup for a dull week in winter.
  • London, Seattle: self-sufficient from about April to September. From November to February the battery runs flat on roughly a third to three-quarters of days, so a generator, or a much larger array, is essential.
  • Glasgow and further north: the winter gap is bigger still. In December and January the systems deliver only about 40–50% of the load on average.
  • The days the battery is "full" show that summer has a large surplus. That's the energy to divert to hot water.

Source: PVGIS 5.3 (European Commission JRC), PVcalc and off-grid (SHScalc) tools, queried 13 November 2026. UK: PVGIS-SARAH3. USA and Australia: PVGIS-ERA5. These are long-term averages: plan for runs of poor weather beyond them.

7. Winter autonomy and generator planning

Days of autonomy

Usable battery ÷ daily load = days the system runs with no sun:

Common off-grid targets are 2–3 days where there's a generator, and 3–5 days without one. In the UK, adding battery alone doesn't fix winter: the array can't refill it. Add panels (especially at a steep tilt) and a generator.

Generator run time and fuel, by month

The monthly fuel use in litres needed to cover the shortfall in the simulation above. Assumptions:

LocationSystemJanFebMarAprMayJunJulAugSepOctNovDecYear: shortfall / run hours / fuel
London3 kW40218110012102340252 kWh / 147 h / 187 L
London5 kW2914511001161528338 kWh / 99 h / 251 L
Glasgow3 kW633213210016234166424 kWh / 248 h / 314 L
Glasgow5 kW46228100013152849592 kWh / 173 h / 438 L
Seattle WA3 kW3414400000172440213 kWh / 125 h / 158 L
Seattle WA5 kW2410300000141728294 kWh / 86 h / 218 L
Melbourne3 kW01011210000012 kWh / 7 h / 9 L
Melbourne5 kW01011110000016 kWh / 5 h / 12 L
Sydney3 kW10101200001011 kWh / 6 h / 8 L
Sydney5 kW00101200000015 kWh / 4 h / 11 L
Phoenix AZ3 kW0000000000001 kWh / 0 h / 0 L
Phoenix AZ5 kW0000000000001 kWh / 0 h / 1 L

Example: in London, the 3 kW system needs about 250 kWh a year from the generator, roughly 150 run hours and 190 litres of petrol, about 85% of it from November to February. In Glasgow that's about 310 litres. In Sydney or Melbourne it's around 10 litres a year.

Automatic generator start

8. Generator integration

Sizing

Earthing and neutral: the critical detail

When the generator runs, the inverter's internal neutral–earth relay opens. The neutral–earth bond must then come from the generator side, or the RCDs or GFCIs can't detect an earth fault.

CountryGenerator requirements
UKUse a generator with its neutral bonded to its frame and earth terminal, connected to the installation's earth. Or fit a bond at the generator inlet that operates only when the generator is the source. Follow BS 7671 Section 551 (generating sets) and Chapter 82. Use a 30 mA RCD (Type B unless the inverter maker allows Type A) on the generator feed. Never use a floating-neutral site generator on its own.
AustraliaThe generator connects through the inverter AC input. The MEN arrangement must give exactly one N–E link in each mode. AS/NZS 4509.1 and AS/NZS 3010 (generating sets) apply. The electrician designs and certifies the arrangement.
USANEC Article 445 (generators) and 250.30/250.35. Whether the generator neutral should be bonded depends on whether the neutral is switched and on the inverter's ground-relay design. A common US design keeps one permanent N–G bond at the main panel and leaves the generator neutral unbonded. Follow the inverter's installation manual, make sure there is exactly one N–G bond in every mode, and confirm with the AHJ.

Installation

9. Fault level, earthing and cable derating

Inverter fault current and protective devices

An inverter, unlike the mains grid, can supply only a limited fault current, often about 2–3 times its rated current for a short time before it shuts down. Check the datasheet. That changes how circuits are protected:

DeviceMagnetic (instant) trip needs3 kVA inverter (≈13 A rated; ≈30–40 A fault)
B6 MCB3–5 × In = 18–30 ALikely trips instantly
B16 MCB48–80 AMay not trip instantly. It relies on the slower thermal trip, or on the inverter shutting down.
B32 MCB96–160 AWon't trip magnetically
30 mA RCD/RCBO30 mA earth leakageTrips for earth faults whatever the fault current

So: protect every circuit with a 30 mA RCBO (UK/AU) or GFCI breaker (US) for earth-fault and shock protection. Size the MCB parts to the cables as normal. Confirm with the inverter maker that it will shut down safely on a line–neutral short that an MCB doesn't clear. Record the measured fault loop impedance and prospective fault current on the certificate.

Earth electrode

CountryTarget
UKWith the inverter providing the N–E link, the system behaves like TN-S, and the electrode stabilises it. Use RA × IΔn ≤ 50 V as a guidance target, as for TT. With a 30 mA RCD that's ≤ 1,667 Ω in theory, but BS 7671 notes that readings over 200 Ω may not be stable. Aim for under 200 Ω, and preferably under 100 Ω.
Australia (MEN)An electrode to AS/NZS 3000 (normally a 1.2 m+ copper-clad rod) at the main switchboard, with the main earthing conductor sized to the standard. Any SPS-specific requirements of AS/NZS 4509.1 also apply.
USAGrounding electrode system to NEC 250. A single rod is acceptable only if it measures 25 Ω or less; otherwise add a second rod at least 6 ft away.

Measure with an earth electrode tester (3-pole fall-of-potential, or a loop tester on a TT system), in dry conditions if possible, and record it.

Cable derating: a worked example

Cable ratings in tables assume one cable at 30 °C. Grouping cables together and hot places reduce the rating:

The same applies to DC battery cables run in a hot cabinet. Use 90 °C or 105 °C insulated cable and check the maker's derating tables. AS/NZS 3008.1.1 and NEC 310.15 give the factors for Australia and the USA.

10. Surge and lightning protection

11. Using surplus energy, and adding wind or hydro

Divert the summer surplus to hot water

The simulation shows the battery is full on most summer days (London: 52–63% of days across the year). Once the battery is full, the MPPTs throttle back and the extra energy is wasted. Two ways to use it:

Adding wind

Adding micro-hydro

12. United Kingdom

Rules that apply

DocumentWhat it covers
BS 7671:2018+A4:2026 (in force since 15 October 2026)The whole installation. In particular:
  • Section 712 (solar PV).
  • Chapter 57 (stationary batteries and battery power conversion equipment, new in A4).
  • Chapter 82 (prosumer's installations, including island mode).
  • Section 551 (generating sets), Chapter 41 (protection against electric shock) and Chapter 54 (earthing).
IET Code of Practice for Electrical Energy Storage Systems; IET Guidance Note 7Battery system design guidance and PV labelling.
PAS 63100:2024Fire safety of battery storage in dwellings, including where batteries must not go.
Building Regulations: Part P (England and Wales); building warrant (Scotland)Installing a new consumer unit or new circuits in a dwelling is notifiable. Use a registered competent-person installer who self-certifies, or apply to building control.
MCS (MIS 3002, MIS 3012)Not legally required. It's only needed for some grants and schemes, and for export payments, which an off-grid system can't receive anyway.
PlanningRoof PV on a house is usually permitted development. Ground arrays, listed buildings and conservation areas have limits, so check with the local planning authority.

Earthing: the off-grid system makes its own

Batteries

PV side (Section 712)

Certification

An Electrical Installation Certificate (EIC) to BS 7671. Test the PV side to BS EN 62446-1 (polarity, Voc, Isc, insulation resistance). Notify under Part P or apply to building control. Keep the design, datasheets and the shutdown procedure with the system.

13. Australia

Rules that apply

StandardWhat it covers
AS/NZS 4509.1:2009 (safety and installation) and AS/NZS 4509.2:2010 (system design)Stand-alone power systems. A revision is under way, with a new edition expected in 2026. Check whether it has been published before you build.
AS/NZS 5033:2021 (as amended)PV arrays: string voltage, fusing, isolators, cable, earthing, signs.
AS/NZS 5139:2019 + Amendment 1 (December 2025)Battery systems with power conversion equipment: location, barriers, arc-flash, signs, safety data sheet. Amendment 1 is now mandatory.
AS/NZS 3000:2018 (Wiring Rules, as amended) and AS/NZS 3008.1.1:2025The AC installation, earthing (MEN), RCDs and cable selection.
Solar Accreditation Australia (SAA) and the Clean Energy Council (CEC) product listsTo claim STCs under the Small-scale Renewable Energy Scheme, the system needs an SAA-accredited designer and installer with off-grid (stand-alone) accreditation, plus CEC-listed panels and inverters. Off-grid PV is eligible. Installer accreditation moved from the CEC to SAA in 2024.

Licensing: who can do the work

Earthing and AC protection

Batteries (AS/NZS 5139)

PV side (AS/NZS 5033)

14. United States

Rules that apply

Code / standardWhat it covers
NEC (NFPA 70), adopted edition (2023 widely, 2026 in some states)
  • Article 690: PV.
  • Article 706: energy storage.
  • Article 710: stand-alone systems.
  • Article 480: batteries.
  • Article 250: grounding.
  • Articles 210 and 230: GFCI/AFCI and disconnects.
NFPA 855 / IRC R328 (or the state's version)Residential battery (ESS) limits and locations.
Listings
  • PV modules: UL 61730.
  • Inverters and charge controllers: UL 1741.
  • Energy storage systems: UL 9540, with the battery to UL 1973 and the cells tested to UL 9540A.
  • PV wire: UL 4703.
Permit and inspectionThe local Authority Having Jurisdiction (AHJ). Most require a permit for PV and ESS even when off-grid. Many let homeowners pull a permit for their own home. Otherwise, use a licensed electrician.
USA version – AC side of an off-grid (stand-alone) system, NEC Article 710 DC side as the main diagram (48 V battery, MPPTs, fuses), using AWG cable sizes from the US schedule Inverter/charger 48 V 5 kW: 2 × 120 V units, split phase 3 kW: 120 V (see 710.15(C)) listed to UL 1741 Output breaker 50 A + lockable disconnect (2-pole for split phase) 6 AWG Cu Main distribution panel (stand-alone service) Main breaker, rated per inverter output 2-pole 20 A – 240 V loads (5 kW only) 1-pole 20 A – kitchen/bath circuits (GFCI) 1-pole 15 A – lighting (AFCI where required) Neutral bar · Ground bar ONE system bonding jumper (N–G) only: here OR in the inverter, never both Grounding electrode system (NEC 250) two rods unless one rod is 25 Ω or less Plaque at panel 710.10 – power sources and their locations 3 kW, 120 V only: WARNING: SINGLE 120-VOLT SUPPLY. DO NOT CONNECT MULTIWIRE BRANCH CIRCUITS Generator (optional) into inverter AC-in, transfer inside the listed inverter PV array rapid shutdown (690.12) if on a building; labels per 690 and 706 Battery / ESS listed to UL 9540 (cells UL 9540A tested), ≤ 20 kWh per unit IRC R328 / NFPA 855 aggregate limits: 40 kWh in utility rooms, 80 kWh in garage, outdoors or detached structure Permit and inspection by the local AHJ before energising. Many AHJs let homeowners permit work on their own home; otherwise use a licensed electrician.
US AC side of the off-grid system (NEC Article 710).

Key US requirements

15. Scaling beyond 5 kW

StepHowWhat to check
8–10 kWParallel two or three identical inverters on one phase, or use one larger inverter (e.g. 8–10 kVA). Use more MPPTs, each with 2 strings.Battery bank and BMS able to supply the combined continuous and surge current of all the inverters. Equal cable lengths to paralleled inverters. Main fuse and busbar rated for the total current.
10–15 kW and aboveThree-phase: one inverter per phase (UK/AU 400 V, USA 208/120 V or 480/277 V), or several split-phase units in parallel.Phase balance, three-phase loads, and a larger and segmented battery. Australia: arc-flash limits. USA: per-unit and aggregate kWh limits.
Batteries > 20–40 kWhA dedicated battery room or outbuilding.USA: NFPA 855 Chapters 4–9 above the residential limits. Australia: AS/NZS 5139 location and arc-flash rules. UK: PAS 63100 and the insurer's requirements.

16. Installation practice and crimping

17. Testing and commissioning

  1. Check the polarity of each PV string and its Voc at the isolator. Compare with the expected value for the temperature. Measure Isc or operating current.
  2. PV insulation resistance to BS EN 62446-1 / AS/NZS 5033: 500 V DC test for strings with Voc between 120 and 500 V, as here; at least 1 MΩ.
  3. Before connecting the batteries, check continuity and that there is no short between the DC busbars. Check every fuse rating against the schedule, and the torque on every bolted joint.
  4. Connect the batteries with the isolator open. Check each module's voltage (within about 0.1 V of the others before paralleling). Close the isolator and confirm the BMS is communicating.
  5. Start the inverter with no load. Check the output voltage and frequency, and the N–E link (exactly one).
  6. Test the AC installation:
    • continuity of protective conductors;
    • insulation resistance (disconnect electronics);
    • polarity;
    • earth electrode resistance;
    • earth fault loop impedance on the inverter supply;
    • RCD (UK/AU) or GFCI (US) trip tests.
  7. Load test: run the largest motor load (pump, fridge) and check surge handling. Measure the millivolt drop across the battery and inverter joints at high load, and look for warm lugs after 30–60 minutes.
  8. Generator test: auto start, transfer, charging current limit, and the RCD on the generator feed.
  9. Paperwork:
    • UK: EIC, BS EN 62446-1 PV test sheet, Part P notification.
    • Australia: electrical safety certificate to the regulator, and the CEC/STC paperwork if claimed.
    • USA: permit sign-off.
    • In every country, keep a system manual and the shutdown procedure on site.

18. Commissioning test sheets

Fill these in as you go and keep them with the system manual. The country-specific certificate (EIC in the UK, the state Certificate of Compliance or CES in Australia, the AHJ sign-off in the USA) is still required. These sheets record the extra off-grid checks.

Sheet 1: PV strings (BS EN 62446-1 / AS/NZS 5033)

StringModulesPolarity ✓Voc expected (V)Voc measured (V)Isc or Iop (A)Irradiance / module tempIR + to E (MΩ)IR − to E (MΩ)
1-14
1-24
2-14
2-24

Sheet 2: DC system

CheckExpectedResultInitials
Each fuse F1–F7 fitted at the scheduled ratingAs schedule
Breaking capacity of F4–F7 ≥ battery prospective fault currentMaker's figure: ____ kA
Torque on all DC lugs and busbars (paint-marked)Maker's Nm
Module voltages before parallelingWithin 0.1 V of each other
BMS communication with the inverter (DVCC or CAN)Online, limits shown
Charge voltage, current limits and low-voltage cut-offAs battery maker
Millivolt drop across each high-current joint at about 50% load< 10–15 mV each
Thermal check after 30–60 minutes at high loadNo hot spots

Sheet 3: AC system and earthing

CheckExpectedResult
Earth electrode resistanceUK < 200 Ω · AU per AS/NZS 3000 · US ≤ 25 Ω or 2 rods
Number of N–E links, invertingExactly 1
Number of N–E links, generator runningExactly 1
Inverter output voltage and frequency, no load230 V 50 Hz / 120–240 V 60 Hz
Continuity of protective conductors (R1+R2)Per circuit
Insulation resistance (electronics disconnected)≥ 1 MΩ
Polarity at every outlet and deviceCorrect
Earth fault loop impedance and prospective fault current, inverter sourceRecord
RCD / GFCI trip time at IΔn≤ 300 ms (UK/AU); GFCI trips
RCD on the generator feed (type and trip)Type B, or Type A where the maker allows
Generator auto-start, stop and quiet hoursAs set
Labels, shutdown procedure and safety data sheet in placeYes

19. Costs and the grid-connection comparison

These are approximate ranges at November 2026, rounded, for budgeting only. "Equipment" means the parts list in this guide (excluding the generator). "Installed" adds design, labour, mounting, certification and the generator. Prices vary widely, so get quotes.

UK (£)USA ($)Australia (A$)
3 kW system, equipment7,000–10,0008,000–12,00012,000–18,000
3 kW system, installed12,000–18,00015,000–25,00015,000–30,000 (industry guide figure for 3–5 kW array + 10–15 kWh battery)
5 kW system, equipment11,000–16,00013,000–19,00018,000–27,000
5 kW system, installed18,000–28,00022,000–35,00025,000–45,000
Generator (inverter type, 3–8 kVA, remote start)800–4,0001,000–5,0001,500–7,000

Compared with connecting to the grid

CountryTypical grid connection cost
UKA simple new domestic connection near the network starts at about £1,300 and averages about £1,800 (Electricity North West indicative costs). Longer distances, overhead line extensions, road crossings and transformer upgrades can take remote sites into many thousands, or tens of thousands, of pounds.
USAAbout $8,000–15,000 to run 1,000 ft overhead, or $10,000–25,000 underground (roughly $8–25 per foot), plus permits. Line extensions of a mile or more often run well into six figures.
AustraliaConnecting remote blocks can cost tens of thousands of dollars per kilometre of line. Some distributors now offer network-owned stand-alone power systems (SAPS) instead of rebuilding long rural lines.

Rule of thumb: if the grid is at the boundary, connecting is usually cheaper. Off-grid becomes competitive once the line extension runs to several hundred metres or more, or where an existing line needs costly upgrading. Then add the value of no electricity bills, minus battery replacement (about every 10–15 years for LiFePO4), generator fuel and maintenance.

20. Troubleshooting chart

SymptomLikely causesWhat to check or do
Inverter overload on motor start (pump, compressor)Surge above the inverter's peak rating. Several motors starting together.Stagger the starts. Fit a soft-start. Check the inverter's surge rating. Put large motors on the generator through the load-start rule.
Battery low by morning in winterNormal winter shortfall (see the simulation tables). Standby loads. A heater or pump running overnight.Check daily kWh in the monitoring. Find standby loads with a plug-in meter. Set generator auto-start on state of charge.
Generator runs but the inverter won't accept itVoltage or frequency outside the acceptance window. A bad earth or neutral bond. AC-input breaker tripped.Check the generator's frequency and voltage under load. Widen the inverter's acceptance range within the maker's limits. Check the N–E bond.
RCD trips when the generator connectsTwo N–E links (generator plus another bond). Incompatible RCD type. A real earth fault.Confirm exactly one N–E link in generator mode. Check the RCD type (Type B or as the maker allows).
MPPT output low on a sunny dayBattery full (normal, it's throttling back). Shading. A string fault or blown string fuse. Dirty panels. Cold Voc lock-out.Compare string currents. Check the controller's errors and history. Do a Voc check per string.
BMS disconnectsCell over- or under-voltage, over-current, or temperature.Read the BMS log. Check charge settings and current limits, and the battery room temperature.
Warm busbar, lug or fuse holderA loose or bad crimp, wrong torque, or an undersized fuse holder.Isolate, remake, re-torque and re-test with the millivolt drop.
Lights flicker on load changesDC voltage sag on long or thin battery cables. Weak or overloaded generator.Measure the DC voltage at the inverter terminals under load. Check generator stability.

21. Maintenance schedule

WhenTask
MonthlyReview monitoring (daily kWh, state-of-charge minimum, generator hours). Visually inspect the battery area and inverter vents. Check the generator oil and fuel.
Every 3 monthsClean the panels if they're dirty. Check MC4 connectors and cable fixings. Test the RCDs or GFCIs with their buttons. Exercise-run the generator.
YearlyTorque check of all DC joints, thermal scan at high load, and millivolt drops. Battery capacity check from monitoring data. Firmware updates. Generator service (oil, filters, plugs). Re-measure the earth electrode. Check SPD status indicators.
Every 3–5 yearsPeriodic inspection and test of the AC installation: an EICR in the UK, or as recommended locally. Re-check PV string IR and Voc.
About 10–15 yearsBudget for battery replacement, and inverter or controller replacement or refurbishment.

22. Labels and signs

WhereUKAustraliaUSA
Main board / switchboard / panelDual-supply / alternative-source notice. Battery-presence notice (BS 7671 Chapter 57). Earthing arrangement."Solar / battery system" signs and the shutdown procedure (AS/NZS 4509.1, 5033, 5139). Generator signs.Power source plaque or directory (NEC 710.10). ESS labels (706). The 710.15(C) warning if a single 120 V supply.
Inverter"WARNING – Isolate both AC and DC sides before servicing"Isolation and shutdown signage per AS/NZS 4509.1 / 5139Equipment markings. Disconnect labels.
PV isolators and junction boxes"PV array DC isolator – live during daylight" (IET guidance)"Solar DC isolator" and "Danger – DC voltage" (AS/NZS 5033)"PV system DC disconnect" (690.13, 690.53). Rapid shutdown label if applicable.
BatteryBattery type, voltage, energy, hazards. No-smoking sign.AS/NZS 5139 hazard signs, arc-flash label if required. Safety data sheet in a pouch.ESS labels (706), and NFPA 855 signage where applicable.

Use durable engraved or UV-stable labels. Exact wording, colours and sizes are in each standard; check the current edition.

23. Frequently asked questions

Is there a legal size limit for an off-grid solar system?

No. The UK's G98/G99, Australian export limits and US interconnection rules only apply to systems connected to the grid. Battery location and size rules (PAS 63100, AS/NZS 5139, NFPA 855) still apply.

Can a 3 kW off-grid system run a house in the UK all year?

Only with a generator. In the PVGIS simulation, a 3.6 kWp / 10 kWh system covers 6 kWh/day from April to September in London, but runs short on most days from November to February. That's about 190 litres of petrol a year through the generator.

Does off-grid work better in Australia?

Much better. In Sydney and Melbourne, the same systems cover their loads on about 98–99% of days, and a generator is only an occasional backup.

Do I need a licensed electrician?

In Australia, yes, by law, for anything above extra-low voltage. In the UK the AC side must be certified to BS 7671, and in a dwelling notified under Building Regulations. In the USA a permit and inspection are normally needed.

Why fuse every battery and add a main fuse?

Fuses in parallel add up. Three 125 A battery fuses could let 375 A into the shared cable without blowing, so a main fuse protects that cable. Each fuse must also be able to break the batteries' combined fault current.

Can I add a wind turbine later?

Yes. Connect it to the DC busbar through its own charge controller with a dump load, fused like any other source. Wind is often strongest in winter, when solar is weakest.

How long do the batteries last?

Typically 10–15 years or 3,000–6,000 cycles for LiFePO4, depending on depth of discharge and temperature. Budget for replacement.

24. Parts list (example)

Item3 kW5 kW
Inverter/charger, 48 V1 × 3 kVA (230 V or 120 V)1 × 5 kVA (230 V or 120/240 V)
LiFePO4 battery modules, 51.2 V 5 kWh with BMS comms23
Solar panels, about 450 W816
MPPT charge controller, 250 V / 70 A12
PV DC isolator, 2-pole, ≥ 250 V DC, ≥ 32 A12
Main battery fuse, Class T with holder160 A250 A
Battery isolator, DC rated≥ 160 A≥ 250 A
Per-battery fuses or breakers (breaking capacity ≥ combined battery fault current)2 × 125 A3 × 125 A
Fused DC busbar (e.g. Lynx Distributor) + negative busbar1 set1 set
Busbar fuses: inverter (F1), MPPT (F2/F3), backed up by F7125 A + 100 A200 A + 2 × 100 A (US split phase: 2 × 125 A + 2 × 100 A)
AC output breaker32 A (US 50 A)50 A (US 2-pole 50 A)
Battery monitor shunt11
AC output isolator, consumer unit/switchboard/panel with 30 mA RCD/RCBOs (GFCI/AFCI in the US)11
Earth electrode(s), earthing conductor, main earth terminal1 set1 set
Surge protection devices (DC PV and AC), if the risk assessment calls for them––
Labels, shutdown procedure, safety data sheets1 set1 set

25. Check your own numbers

26. Sources

  1. European Commission JRC – PVGIS 5.3 (PV yield and off-grid simulations)
  2. Electricity North West – Indicative costs of a new domestic connection
  3. Angi – Cost to run electric service 1,000 ft
  4. Energy Matters – Off-grid solar system cost in Australia (2026 guide)
  5. Victron – MultiPlus-II inverter/charger datasheet (continuous VA and W, and peak ratings)
  6. Victron – MultiPlus-II 230 V installation (DC fuse and cable table, earth relay, Type A RCD)
  7. Victron – SmartSolar MPPT 250/70 technical specifications
  8. SEIAPI/PPA – Off-grid PV power systems installation guidelines (AS/NZS based), v3 September 2025
  9. NSW Government – Changes to the battery standard (AS/NZS 5139 Amendment 1)
  10. GSES – Habitable rooms and restricted locations for battery installation
  11. Standards New Zealand – Update of the stand-alone power systems joint standards (AS/NZS 4509)
  12. SolarQuotes – Wiring without an electrical licence in Australia
  13. Battery Design – PAS 63100:2024 summary
  14. BS 7671 and solar PV – UK regulatory guide
  15. IET Wiring Matters – The impact of Amendment 4:2026
  16. Florida Solar Design Group – Residential battery ESS size limits (NFPA 855)
  17. EC&M – NEC requirements for stand-alone power production systems (Article 710)
  18. Solar Permit Solutions – NEC 690.12 rapid shutdown and exemptions
  19. Solar Builder – What to know about the 2026 NEC

This guide is guidance for typical systems, not a substitute for a site-specific design. OffGridVolts accepts no liability for installations based on it. Have the installation designed, inspected, tested and certified as your country's rules require.